Rowville House

  • Turning Soil with Syd ever present
  • Setting up for the slab
  • Rear of house slab setup
  • Slabs always look too small!
  • One Deep slab
  • 2.5 metres of Blinding concrete under slab
  • Framework happening
  • Framework getting ready for trusses
  • Framework from the rear
  • Trusses up on main Structure
  • Great Roof structure
  • Very Solid leak resistant design
  • Craig come to help
  • Brickwork underway
  • Every garage should be scissor trussed
  • Garage shaping up
  • Strapping in ready for wall insulation
  • Structure shaping up nicely
  • A year after move in 180m of trenches filled
  • Gras down ready for Garden beds
  • Sprinklers and lighting wiring
  • Garden beds shaping up
  • Outdoor area useable with Brick BBQ
  • Slaving away again!
  • The Famous Love Heart
  • Mary Checking our progress
  • Rock work and planting
  • Garden shaped and planting underway
  • Completion is now foreseeable
  • Planning contrasting flora shapes
  • The trusty Neilbarrow was amazing
  • Contrasting colors and shapes
  • Lighting, sprinklers etc automated
  • Great usability of the land, house and workshop
  • Final product
  • A little more growth